Some elements on this page did not load. Refresh your site & try again.

Featured Posts
Some elements on this page did not load. Refresh your site & try again.

Recent Posts
Some elements on this page did not load. Refresh your site & try again.

Archive
Some elements on this page did not load. Refresh your site & try again.

Search By Tags
Some elements on this page did not load. Refresh your site & try again.

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

The East Rhyl Coastal Defence Scheme will reduce the risk of coastal flooding in the Garford Road area of East Rhyl.

The East Rhyl Coastal Defence Scheme is led by Denbighshire County Council, with support from the Welsh Government. Balfour Beatty has been appointed as the main contractor to deliver the Coastal Defence Scheme, and is currently working with Denbighshire County Council, and the Environmental and Engineering Consultancy JBA Consulting through early design and development works.

The project will involve the construction of a rock revetment structure immediately in front of the existing sea wall, with improvements to the existing wall over a length of around four hundred metres, from Splash Point heading East.

The East Rhyl Project will expand upon the recently completed flood storage works completed by Denbighshire County Council since the coastal flood event in 2013.

Material on this site is for personal, non commercial use. No part of the site may be copied or adapted without written

permission from Balfour Beatty.

We have made every effort to ensure the accuracy of the information on this website. But we cannot accept responsibility
for any inconvenience, loss or damage caused as a result of inaccurate information on these pages.

Copyright ©Balfour Beatty 2018